Unit of Action
Institutional Training Strategy
(UA ITS)
Mr Wilson
Mr Wilson, 22 Jun 04, VI. 0
09/11/16
Purpose
Summarize the UA ITS Task Force's efforts
leading to the approved Training Strategy
Provide an overview of the CG, TRADOC
approved UA institutional training strategy
Discuss the way ahead for implementation
of the approved Training Strategy
CSA Comments From OF Institution
Training Strategy RRC - 29 May 03
1. Ideal strategy is to train individual through Bn/Bde collects
level in simultaneous multi-echelon manner, capping the
training period with a CTC rotation and handing over to
FORSCOM a C2-level trained unit. How can the institution hel
enable this?
2. One of our courses of action needs to account for the
institution training from individual through complete collectiv
level.
3. SoS requires greater competency and higher collective
capability. Units can't do it on their own, so how does the
institution enable SoS NET?
Tasking : Establish a Task Force to develop UA ITS
3
UA ITS Task Force's
Mission Statement
Develop a Unit of Action (UA)
Institutional System of Systems (SoS)
Training Strategy for UA 2-n by Dec 03
for approval by CSA and input to POM
06-11.
Key Planning Factors
* UA Implementation Timeline
- Begin Institutional Training
FY12
- UA #2 E-date FY12
- FOC FY13
• Field 2 UAs per year (steady
state)
4
Organizational Structure
Core
24/7 Members :
COL Murphy, DCSOPS&T
Mr Whitney, ATSC
Mr Armitstead, DCSDEV
Mr Francis, ATSC
Mr Klesch, ATSC
Mr Jones, TRID
CAC G-3
LSI Tng IPT
Collaborative Members :
FORSCOM
BCBL
CADD (UE)
UAMBL
AAC
DCSOPS& T (PPD)
Schools
CASCOM
MANSCEN
ASAALT
DAMO-TR
BCC
Leverages G8
USF Tiger
06 Level I PAT
HQDA G1/2/3/4/8/OF TF
ASAALT
FORSCOM
AMC
NGB
OCAR
AAC
DCSDEV
CAC-T
BCBL
CADD (UE)
UAMBL
BCC
LSI Tng IPT
PEO STRI
TSM FCS
Comp System TSMs
GOSC
HQDA G1/2/3/4/8/OF TF
ASAALT
FORSCOM
AMC
NGB
OCAR
AAC
DCSDEV
CAC-T
UAMBL
BCC
LSI Tng IPT
PEO Ground Combat Systems
PEO STRI
Comp System PEOs
5
UA ITS Timeline
(Major Deliverables & Meetings)
Deliverable
* War Game AAR
* COA Decision Brief
Deliverable
COA Decision
Deliverable
* COA analysis results
* Recommended COAs for War
Game
* War Game Plan
TRADOC QFR
CG TRADOC I Pit
Deliverable
* COAs for analysis
* Evaluation Criteria
Deliverable
Mission Statement,
Mgt Structure, &
Action Pl a n
Jan-Dec 04 r School STRAP
18 Deo r Coord 06-11 P<
24
13 Nov
§ W©v X CG TRADOC IPR
3 \om/ TRADOC CoS IPR
27-30 ( dr War Gai^ie
TRADOC CoS
Sync Confere
20
14-17 O
1 OctV War Game Sync VT
CG TRADOC IPR
GO I
OBIECTIVE
War Game AAR 30 Oct
14
11 Au
28 Jul
23 Jul / IPAT Level IPR
16 Ju y GO IPR-
IPAT Level IPR
Sync VTC
CG TRADOC IPR
OBIECTIVE
• Review preliminary COA Eval
results
• Recommend COA for War Game
• Review Draft war Game Plan —
IPAT Level IPR
CG TRADOC IPR
OF IT RRC
OBIECTIVE
Review Draft COAs &
Evaluation Criteria
6
r r\
Results of
G8 Tiger
Team Initial
Efforts
pring
UA Fielding COA 1
UA Fielding COA 2 (Modified)
P* tt'l >: Fgf h :qn me
Evolution of COAs
Fn « P4«t^
kuiH.-n
'.TJ.Mil? I
Bjulp
TS
UA Fielding COA 3 (Modified)
UA Fielding COA 4 (Modified)
Fen»d»: fr^oetAcnt;
V /X V
1-3 &W.*« 1-3
CVcIc RegBiCTiikui
Un. AjIIWK i
■In ik
eguipnta
TTA Cen duct:
»llsctiwtnnin?t»
: Mo;
Current un it emp It red
•n * retst»n
... .. UAiniB^iikxret't Iran
COA 4 (Modified) tffristiii.rikiji, At
HoincSMiii
Fartrindraave uagnivri oiaitel truing M
TRADO C tiritniioTi* siPiiteto h®i\e fttim (tidule
NETOFLlr tiig) UAictBi« gthomertiiai, Ikstu
e^jqiiitei, Aiai kiiM alHii'diLf It IOC
I A Current miiaiirn (f® dk'nty
^ -4 Renly ifinki^ UA ictA itk'n Cmraimi
| iq'lty f otl i rrtiikn pD® to UA *m4 to HS
Realm®* R»k 3 Mndu
COA 1
COA 2
USMA ORSA
COA 3
COA 4
Lowers Training Risk; Need Clarification
of Read ness Risk Mitigation
Criteria and Metrics
Evaluation Criteria:
1. Non-Dollar Criteria;
a. Quality Force
b. USF UA Effectiveness
c. Non-USF Unit Effectivi
d. Institutional Effectivei
2. Dollar Cost Criteria:
a. 2nd Destination Cost
b. ITRM
c. UA Personnel
d. OPTEMPO (TRM)
e. Personnel Managernj
f. Equipment
g. Installations
UA Transformation COA 1
(Existing brigade converts to UA; organizes, equips & trains through UA level proficiency at home station)
E-d*to EQ£
Unit Reorg /
Builds at e
|Home Station Ho |
UA Transformation COA 2
(Existing brigade converts to UA; organizes at home station; equips & trains crews at TRADO
completes training through UA level proficiency at home station)
Edat U A Transformation COA 3
(Organize, equip and train a provisional UA at aTRADOC managed site; activate and PCj
Results of
UA ITS TF
Efforts
Jun-Sep
^^03
_ Equip 2 I
COA 5
J^ eadi,
Selected
unit
NI
personnel
(-20%)
C'n
Indv/Ldr/
C
institutions
Inst
Tug
Er
C
Uni
&E
at E
All
Soldiers/
Leadeis
receive UA
training in
TRADOC
prior to
E-date
i
Pr
G
Cr
ACu
read
Cum
UA Transformation COA 4
(Activate, organize, equip and train a UA at home station)
UA Transformation COA 5
(Organize, equip and train UA subordinate elements at Battlefield Functional Area (BFA) training sites;
move UA to a single site & complete UA level collective training; activate and PCS to a home station)
FOC
E+150 E+240
E-(late
Unit Set Fielding
FORSCOM C2
Unit Reverts tt
FORSCOM
Control; Moves
UA Level Tng Site
& Completes UA
Collective
Training to FOC
All
Soldi
Leaders
receive UA
training in
TRADOC
prior to
E-date
o
Unit Organizes &
Draws Equip at
TRADOC BFA Sites
TRADO C/AMC
Provide Delta-Net &
Collective Training to
BFA Level
Qualification
Current Unit
Operationally Ready
6 Mos
Current Unit
T I Inactivate
3 Mos *
Employ 26.5 Mos
Cyclic Regeneration
Readiness Risk: 4.5 Mos
36 month Unit Manning Cycle begins at E-Date
/ TRADOC schools produce all UA qualified soldiers leaders for
jj: E-Date. TRADOC BFA sites organize, equip and train UA
: subordinate elements to battalion separate company level
jjj proficiency
: E+150. provisional UA is formed at single training site & under
; FORSCOM C2 completes collective training to achieve UA level
; proficiency by E +2 10
Simultaneously, an existing brigade, under FORSCOM C2, begins
: deactivation, turns in equipment. PCSs soldiers families, and
;> clears post by E+240
| E+210. provisional UA conducts CERTEX (initially at CTQ & is
FOC by E+240. Provisional UA is activated & completes PCS by
: E+285 to borne station
UA has 26.5 months available for employment before cyclic
i regeneration begins
f A Current Force unit remains operationally ready during
< this period to reduce readiness risk during activation ^
{ transformation of UA
Evaluate
Compare
Recommend
7
War Game
Exercise
Structu re
BG Weber
G3
LSI (Tng & Log)
Comp Sys PM
PEO STRI
BG Seay
ASA(ALT)
COL Robards
FORSCOM
MG Barrett
TRADOC
Integration &
Spt Cell
UA ITS TF
ATSC
USMA Sys Eng
FC
CAC G3
AMC
CASCOM G3
AAC
BCBL
-
CAL
AMCOM
OD DOT
-i
UAMBL
CAC-T
CECOM
TC DOT
TSM FCS
TACOM
QM DOT
-i
SSI DOT
DCSOPS&T ITD
MANSCEN G3
CH DOT
AMEDD DOT
□ BOD
□ Integration/Spt
■ Red Cell
□ 06 Level Role Payers
AR DOT
AV DOT
IN DOT
Ml DOT
SC DOT
FA DOT
EN DOT
CM DOT
MP DOT
8
CG Guidance
(5 Nov 03)
Each COA will be based on the "conversion" of an
existing brigade
Focus on where you do it and under who's control
Converting unit must remain at 100% strength during
equipment turn-in, and draw down only as equipment
is turned in
Look at turning in equipment during the last 6
months of its employment window
After turn-in, the unit will begin to reorganize
Revise COA 3 ...
- Unit personnel will PCS to home-station, then unit
move conducted to TRADOC UA training site
- Don't create another full scale CTC
Revised COAs
(Based upon CG's Guidance)
COA IV- A : Convert a brigade at home station under
FORSCOM C2 with TRADOC support for NET/NOT and crew
level training.
COA 3V : Convert brigade at home station
and train to UA level at an FCS training
site under TRADOC C2.
COA 4V : Convert a brigade at home station under
FORSCOM C2 with TRADOC support for NET/NOT through
company level training.
10
UA Transformation COA 3V
E-135
E-45
E-Date
E-15
FOC
Operationally
Available
(25.5 Mos)
' Equip Turn-ir
(3 Mos)
i Reorg
(1 Mo)
©forscom C2
Unit Set Fielding
Equip
(3 Mos)
Collective IVaining
(6 Mos)
} TRADOC C2
E+90
Operationally
Available
(30 Mos)
Unit turns-in
equipment
and then
transitions
personnel
ns
£
UA
draws
PCS / ETS at
Otradoc C2
New Personnel receive UA
Training at Institution (50-
70%)
as
>
o
Z
-M
c
D
^PMs / TRADOC
Provide NET/
NOT for
unqualified
.Cnlrlinyr ZUH L
TRADOC Provides Collective
Training to UA Level; UA
conduct EXEVAL at CTC and
returns to Home Station
Convert a brigade at home station and train to
UA level at an FCS training site under TRADOC
C2.
li
COA 3V
Advantages
* Delivers an operational UA to
FORSCOM
* Strengthens the link between the
institution and operational units
* Enables spiral change within the
Army
* Increased efficiency and
standardization of training
* Minimizes distractions on
converting unit
* Limited impacts on other units for
training support
Disadvantages
* Lengthy family separation
* Increases Institutional Army
force structure
* Split C2 during conversion period
Mitigation
* Reduce Institutional force structure increases through
contracting
* Training site selection could reduce facilities cost
Conclusion
*CG f TRADOC approved COA 3V: Convert
brigade at home station and train to UA
level at an FCS training site under
TRADOC C2.
• Way Ahead
-Transition overall lead to Futures
Center
-Develop implementation plan
* UA STS Decision Brief to CG, TRADOC 13 Nov 03?
Briefed at ©FR 24 Nd;/j CG's memo to CSA 23 Dec
03
13
Supporting Concepts &
Initiatives
14
Reach
Initial Capability (2003)
Battle Command Training
Center (BCTC)
TADLP Digital Tng
Facility (DTF)
Institutional
Classroom XXI
15
Reach
Objective
lome Station Operations
Force (2015)
Center (HSOC)
In Route Mission
Planning &
Rehearsal
idKriii • ..lLlL.
AKE
.
iifffi
limit
mu*
Combat Tng Centers
Star Wars Bldg
pttin
limit
TRADOC Centers & Schools
Resource Centers
(firm
nnnt
nrn^B
National Simulation gaining Support
Resource Center ^source Center
NLOS-C
Home Station/Deployed
16
Initial Military Training (IMT)
Traditional Approach
Commander
receives Soldier
with apprentice
skills
Institution
i mi Lid i military training |imij
Assignment Oriented Training
■ raining uii-uenicinu
Assignment Oriented Training
(AOT)
.osing Command
Institution
19
Digital training i-acnmes c*
ABCS Digital Training
TADLP Digital Tng
Facility (DTF)
ABCS Digital Skills
Classrooms
: - j ■JjpM.T ,
iWSril
ip*,; '" H - ■
jM JTF. f
4 ?tfi
".lljj i iEv
. i
&
cj
I
r
l-J
irf
\17
tT
20
Battle Simulation Centers
(BSC)
Analog
3 Mission Support
'& Training Facility
M (MSTF)
Battle Sim Center
(BSC)
&
K
"X " i
Kw 1
j .jv ‘ji ‘jilt r J
U' I , Jf
A i Jr ■ rT 1 H
fl ‘ rifl- f
J ‘f'ijSr • ■ -ll'-It-J
V > T /,
f oTrjii'J , J 1_ 1
j/^|4
if\ / * r j. i .
SS toda
Jr
■flr J
£ ' KlI ‘^jSF-
i “ i/i 1 1 .
I * ji # r f ^
r
11 W/ JSC?
uf -,4 ! i:
fflkk , -a£to i W j
^ '■ufr ;
i r/ m'J TtTi.
& ■» ■ A
mi
J 1 a -I jJ^pTl
1 r&’t jfjj • ,'
juf j-jjr
jfJ/fJ. . '■ 1 'if
Sm jirl M f il 0
i ’lyl ij
21
uignai irammg support lempiaie
SBCTs & Digitized Current Force
( 2008 )
Battle Command Training Center
(BCTC)
AKE
(Classroom XXI)
FT
Battle Sim
Center
Connectivity - Fiber
(BSC)
Ranges
Virtual Sim
CCTT. AVCi
ulatio
TADLP Digital Tng
Facility (DTF) x
* Digital Ranges
* Analog Ranges
* CACTF
* Maneuver Areas
ABCS Digital Skills EST Driver Trainers • HITS/DITS
Training Included
Template
Unit of Action - Home Station
Home Stat
ons Center
(HSOC)
/ f AKE
4ISR & ET Enabled
Battle Sim
Center
Connectivi
RS&V
NLOS-C
TADLP Digital Tng
Facility - Enhanced (E
DTF)_j ^
^/virtual Simulations
S-CATT, CCTT, AVCATT, Etc
Digital Ranges
Configurable
Ranges
CACTF
* Instr Maneuver
23
Back Up
24
Differential Cost
Initial Investment ( Includes Temp Facilities for COA 3V)
Criteria
COA 1V-A
COA 3V
COA 4 V
NET/M FT
82M
-
101M
Separation Allowance
-
5M
-
Facilities
375M *
-
Total
82M V
380M
101M
Note: Spread over 3 years . . _ .
7 Recurring Annual Costs
Criteria
COA 1V-A
COA 3V
COA 4V
NET/M FT
82M
-
101M
Separation Allowance
-
5M
-
Facilities
-
26M
-
Total
82M
31M
101M
Life-Cycle Costs (15 yrs)
Criteria
COA 1V-A
COA 3V
COA 4 V
NET/M FT
1,230M
-
1,515M
Separation Allowance
-
75M
-
Facilities
-
739M
-
Total
1,230M
840M V
1,515M
25
Differential Cost
Initial Investment ( Includes Permanent Facilities for COA 3V)
Criteria
COA 1V-A
COA 3V
COA 4 V
NET/M FT
82M
-
101M
Separation Allowance
-
5M
-
Facilities
869M *
-
Total
82M V
874M
101M
Note: Spread over 3 years . . _ .
7 Recurring Annual Costs
Criteria
COA 1V-A
COA 3V
COA 4V
NET/M FT
82M
-
101M
Separation Allowance
-
5M
-
Facilities
-
3M
-
Total
82M
8M V
101M
Life-Cycle Costs (15 yrs)
Criteria
COA 1V-A
COA 3V
COA 4 V
NET/M FT
1,230M
-
1,515M
Separation Allowance
-
75M
-
Facilities
-
911M ^
-
Total
1,230M
986M V
1,515M
26
Decision Matrix
(BOD)
C riteria
Weiaht
COA 1V-A
COA3V
COA4V
Si malic its/
1
(2.5)
2.5
(1)
1
(2.5)
2.5
Well Beinq
2
(1.5)
3
(3)
6
(1.5)
3
T rainina Standardization
0.75
(3)
2.25
(1)
0.75
(2)
1.5
Onerational Availability
0.75
(2.5)
1.88
(1)
0.75
(2.5)
1.88
Flexibility
1
(2.5)
2.5
(1)
1
(2.5)
2.5
C2
1
(1.5)
1.5
(3)
3
(1.5)
1.5
Life-Cvcle Cost
1.5
(2)
3
(1)
1.5
(3)
4.5
Score (Lowest is Best) (15.5)
16.63
(11.0)
14.0
(15.5)
17.38
27